The session will be presented by Michael O’Neill, Head of Business Development at Decom Engineering. Michael will provide an overview of the TRACS-16 system and share insights from its first offshore deployment in Australia.
The webinar will cover:
- The concept of eliminating the cut-to-recovery gap through integrated cutting and recovery systems
- An overview of the TRACS-16 (Twin Recovery & Cutting System) and its modular, crane-deployable design
- Operational benefits and vessel time savings achieved by combining cutting and recovery in a single deployment
- Use of quick-connect cutting tools, ROV-assisted positioning, and handling pipeline sections up to 20 metres in length
- An Australian case study from the first offshore deployment of TRACS-16
- Performance insights, including cycle times, blade longevity, and efficiency gains achieved by minimising subsea tool changes
As always, our webinars are free for all to attend.
