• Owner Costs

    • Short Term (0-5 Years)

      • Undertake Research to Reduce Risks for Leave in Place

      • Curation, Digitisation and Life Cycle Management of Key Data

      • Hands Off 3D Survey and Access Tools for Surface and Subsea Facilities and Pipelines

      • Smart Contaminate Detection Tool and Management of Contaminates During Operation

      • Development of Decommissioning Emission Reduction Plan

    • Medium Term (5-10 Years)

      • Advanced Monitoring and Sampling Techniques

      • Use Mechanically Connected Risers and Flowlines- Improved Installation and Decommissioning

      • Deployment of Decommissioning Emission Reduction Plan

    • Long Term (10-25+ Years)

  • Well P&A

    • Short Term (0-5 Years)

      • Establish Australian Well P&A Working Group

      • Alternative Wellhead Cut and Recovery Technologies

      • Alternative Barrier Technologies

      • Alternative Tubular Removal

      • Barrier Placement Techniques (PWC)

      • Rigless Plug and Abandonment (P&A)

      • Well Data Accumulation and Analysis

      • Multi-String Wireline Logging

    • Medium Term (5-10 Years)

      • Developing Technologies

      • Artificial intelligence and Machine learning

    • Long Term (10-25+ Years)

      • Developing Technologies

  • Facility / Subsea / Pipeline Preparation

    • Short Term (0-5 Years)

      • Multifunctional Soaking-Flushing-Pigging Products

      • Deploy Containerised Power, Control and Comms Switch Room

      • Develop Hands Free Access Tools

      • Topsides Cleanliness Optimisation with Respect to Disposal Pathway

      • Marine Growth Removal Optimisation

      • Automation of Cleaning/Flushing Process

    • Medium Term (5-10 Years)

      • Develop or Deploy Advanced Pigging Systems

    • Long Term (10-25+ Years)

  • Facility Removal

    • Short Term (0-5 Years)

      • Study Floating In-Loading Facility to Optimise In-Country Recycling

      • Automate/Robotise Cutting Process

      • Development of Hands-off Rigging and Access Operation

      • Deployment of New Materials for Rigging

      • Deploy Advanced Cutting Technologies (e.g. Laser)

      • Optimise In-Country Marine Assets to Support Decommissioning Plans

      • Deploy Walk-to-Work Access Technology

    • Medium Term (5-10 Years)

      • Develop/Adapt Oil & Gas Decommissioning Technology into Offshore Energy (e.g., Wind)

    • Long Term (10-25+ Years)

      • Develop/Adapt Oil & Gas Decommissioning Technology into Offshore Energy (e.g., Wind)

  • Subsea / Pipelines / Flexibles Removal

    • Short Term (0-5 Years)

      • Further Develop Reverse S-Lay Concept

      • Deployment of Leave-in-place related Technologies

      • Optimise In-Country Marine Asset to Support Decommissioning Plans

      • Deploy New Materials for Rigging

      • Deploy Advanced Cutting Technologies (e.g. Underwater Laser)

      • Develop Optimised Shore-Crossing Removal Equipment

      • Automation of Seabed pipeline cutting and lifting

      • Develop Marine Vessel Based System for Flowlines & Umbilicals Removal & Cut to Aid Recycling

    • Medium Term (5-10 Years)

      • Develop / Deploy Potential Leave-in-Place Compatible Materials

      • Automation of Vessel Pipeline Cutting and Removal

    • Long Term (10-25+ Years)

  • Decontamination / Recycling / Disposal

    • Short Term (0-5 Years)

      • Develop/Deploy In-country Flowlines and Umbilicals Recycling Equipment and Feedstock

    • Medium Term (5-10 Years)

    • Long Term (10-25+ Years)

  • Monitoring

    • Short Term (0-5 Years)

      • Post Well P&A Monitoring using Remotely Operated Vehicle and Autonomous Underwater Vehicles

    • Medium Term (5-10 Years)

      • Improved Autonomous Remote Marine Environment Surveying Equipment

    • Long Term (10-25+ Years)

Select a category